
New TopShim run:

version = topshim 2.4.0
date = 2025-04-10
time = 06:51:11.073
command = topshim  tunea

FINE SHIMMING

Parameters:

probe = Z824801_0191
solvent = D2O
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 4.70 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.5 Hz, After= 0.5 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.527


Performing tune after shimming
tune lock level increase = 1.0

shim changes: 
Z	-6
Z2	-22
Z3	-6
Z4	+292
Z5	+40
X	+2
XZ	-9
Y	-4
YZ	-56

duration = 3 min 59 sec
completed successfully
finished Thu Apr 10 06:55:08 2025


========================================================================
