Options
Kapazitätsplanung und -steuerung in der Instandhaltungsproduktion von Investitionsgütern
Citation Link: https://doi.org/10.15480/882.1402
Publikationstyp
Doctoral Thesis
Publikationsdatum
2017-07
Sprache
German
Author
Advisor
Referee
Title Granting Institution
Technische Universität Hamburg-Harburg
Place of Title Granting Institution
Hamburg
Examination Date
2017-05-31
With the proposed applications, uncertainty of work order times can be taken into account for capacity planning, coordination and control to reduce or avoid the consequences of uncertainty. The method adds ranges to work load planning and defines the occurrence pro-bability for this range of work load. This enables capacity flexibility to be adjusted to existing uncertainties to save costs and avoid a deficit in flexibility. Real work orders of maintenance and repair production for flight engines validate the methods in this book.
Schlagworte
Kapazitätsplanung und -steuerung
Instandhaltungsproduktion
Investitionsgüter
Unsicherheit
Kapazitätsflexibilität
DDC Class
620: Ingenieurwissenschaften
Loading...
Name
Diss_Koppold_20170723.pdf
Size
1.9 MB
Format
Adobe PDF