Options
Transient multiple hoist scheduling of consecutive cyclic schedules
Publikationstyp
Conference Paper
Publikationsdatum
2011
Sprache
English
Institut
Start Page
357
End Page
362
Article Number
6042420
Citation
IEEE International Conference on Automation Science and Engineering (CASE), 2011 : Trieste, Italy, 24 - 27 August 2011. - Pscataway, NJ, 2011. - Art. no. 6042420 (i.e. pp. 357-362) (2011)
Publisher DOI
Scopus ID
Publisher
IEEE
This paper addresses the transient multi-hoist scheduling problem in flexible manufacturing facilities and focuses on the Lot Switching procedure. The problem arises in automated electroplating lines where multiple hoists are operating on a shared track and due to a flexible production different product types needs to be manufactured which differ in the routing through the facility. The considered processing sequences may contain loops, i.e. multiple usages of single machines within a sequence. In addition the electroplating line may be equipped with identical machines used as parallel resources. A mixed integer linear programming (MILP) model for optimizing the Lot Switching schedule is presented considering in particular collisions of hoists. A real world example indicating that the model finds schedules for the transition in reasonable time is presented. © 2011 IEEE.
DDC Class
600: Technik
620: Ingenieurwissenschaften