Options
Connecting productivity, capacity and lateness with the help of operating curves [Produktivität, Kapazität und Terminabweichung: Eine Modellierung mit Kennlinien]
Publikationstyp
Journal Article
Publikationsdatum
2019
Sprache
German
TORE-URI
Enthalten in
Volume
109
Issue
4
Start Page
235
End Page
239
Citation
WT Werkstattstechnik 4 (109): 235-239 (2019)
Publisher DOI
Scopus ID
Many manufacturing companies consider productivity and lateness as very import performance indicators. In theory as well as in the industrial practice both terms usually are considered isolated. Nevertheless they are linked to each other. A lower than expected productivity often results in an increasing backlog and thus a higher lateness. This paper proposes a way to model the relationship between productivity and lateness with the help of operating curves.