Publisher DOI: | 10.3390/en12061003 | Title: | Effect of different interval lengths in a rolling horizon MILP unit commitment with non-linear control model for a small energy system | Language: | English | Authors: | Erichsen, Gerrit ![]() Zimmermann, Tobias Kather, Alfons |
Keywords: | mixed integer linear programming; unit commitment; rolling horizon; slands; nonlinear control; MILP models; renewable energies; long-term storage | Issue Date: | 14-Mar-2019 | Publisher: | Multidisciplinary Digital Publishing Institute | Source: | Energies 12 (6): 1003 (2019) | Abstract (english): | In this paper, a fixed electricity producer park of both a short- and long-term renewable energy storage (e.g., battery, power to gas to power) and a conventional power plant is combined with an increasing amount of installed volatile renewable power. For the sake of simplicity, the grid is designed as a single copper plate with island restrictions and constant demand of 1000 MW; the volatile input is deducted from scaled 15-min input data of German grid operators. A mixed integer linear programming model is implemented to generate an optimised unit commitment (UCO) for various scenarios and configurations using CPLEX® as the problem solver. The resulting unit commitment is input into a non-linear control model (NLC), which tries to match the plan of the UCO as closely as possible. Using the approach of a rolling horizon the result of the NLC is fed back to the interval of the next optimisation run. The problem’s objective is set to minimise CO2 emissions of the whole electricity producer park. Different interval lengths are tested with perfect foresight. The results gained with different interval lengths are compared to each other and to a simple heuristic approach. As non-linear control model a characteristic line model is used. The results show that the influence of the interval length is rather small, which leads to the conclusion that realistic forecast lengths of two days can be used to achieve not only a sufficient quality of solutions, but shorter computational times as well. |
URI: | http://hdl.handle.net/11420/2182 | DOI: | 10.15480/882.2117 | ISSN: | 1996-1073 | Journal: | Energies | Other Identifiers: | doi: 10.3390/en12061003 | Institute: | Energietechnik M-5 | Document Type: | Article | Project: | Open Access Publizieren 2018 - 2019 / TU Hamburg VEREKON |
Peer Reviewed: | Yes | License: | ![]() |
Appears in Collections: | Publications with fulltext |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
energies-12-01003.pdf | 1,54 MB | Adobe PDF | View/Open![]() |
Page view(s)
462
Last Week
2
2
Last month
14
14
checked on Jun 3, 2023
Download(s)
394
checked on Jun 3, 2023
SCOPUSTM
Citations
9
Last Week
0
0
Last month
1
1
checked on Jun 30, 2022
Google ScholarTM
Check
Note about this record
Cite this record
Export
This item is licensed under a Creative Commons License