Title: Connecting productivity, capacity and lateness with the help of operating curves [Produktivität, Kapazität und Terminabweichung: Eine Modellierung mit Kennlinien]
Language: German
Authors: Glöckner, Robert 
Lödding, Hermann 
Issue Date: 2019
Source: WT Werkstattstechnik 4 (109): 235-239 (2019)
Journal or Series Name: wt Werkstattstechnik online 
Abstract (english): Many manufacturing companies consider productivity and lateness as very import performance indicators. In theory as well as in the industrial practice both terms usually are considered isolated. Nevertheless they are linked to each other. A lower than expected productivity often results in an increasing backlog and thus a higher lateness. This paper proposes a way to model the relationship between productivity and lateness with the help of operating curves.
URI: http://hdl.handle.net/11420/4756
ISSN: 1436-5006
Institute: Produktionsmanagement und -technik M-18 
Type: (wissenschaftlicher) Artikel
Appears in Collections:Publications without fulltext

Show full item record

Page view(s)

23
Last Week
0
Last month
3
checked on Sep 23, 2020

Google ScholarTM

Check

Add Files to Item

Note about this record

Export

Items in TORE are protected by copyright, with all rights reserved, unless otherwise indicated.