Now showing1 - 1 of 1
  • Some of the metrics are blocked by your 
    Item type:Publication, Access status: with files ,
    Product-specific and early-staged determination of production space needs
    (VDI Fachmedien, 2024) ; ; ; ;
    Metzmacher, Paul
    Dynamic markets, scarce space, and increasing automation reshaped the conditions for factory planning and reduced the applicability of established methods. Especially in the early phase of factory planning, a reliable estimate of space requirements based on incomplete information is necessary. This article presents a method for determining space needs in piece goods production and validates it using the example of aircraft industry.
    Publicationtype: Journal Article
      21  65